Well now time for the report…………
Cuppa tea.
Started @ 9.00am, the Exhaust came off very quickly. Downpipe came off in about 30-40 mins.
Coffee – (Think the milk is off!)
Fitment of new downpipe was quite easy, some tricky bolts to access to remove rear engine stabiliser though. Also the terminators for the lambda probe cable were the reverse to what was actually needed – got round this by simply filing off the locating block. Still locks as it should.
Then there was a power cut for two hours, luckily car was down on the ramp, so upgraded the injectors…....
No Tea or Coffee at this point. (Reverted to pop)
Power back on ……Coffee (Fresh milk)
The exhaust itself went on rather nicely although the clamps supplied could be better.
Also discovered that I needed a couple more exhaust rubbers……after a quick call 2 x rubbers arrive – result!
After fitting the clamps we put a few spot welds on the joints (can be ground off for access) to make doubly sure nothing moved. This was especially true for back boxes that took about 10 mins to get right.
Coffee and cake
Changed the oil and filter – no flush.
Remap – This took slightly under 5 mins.
Started engine, topped up oil and went out for a drive………..
The biggest issue was a slight knocking from the centre section, due to the expansion of the exhaust, but a lump hammer and a couple of pry bars later all was sorted…… well also after about 4 test runs, some swearing and exhaust adjustment.
Bookmarks