got a list of stuff that needs done to my motor today. got 99% of the parts required and the rest are being deliverd today. well should be anyway. so the cars up on axle stands ready to go! heres my list of jobs!
1.replace front suspension with b4's and lowering springs
2. replace rear suspension with b4's and lowering springs
3. strip all 4 calipers and greese up pads. squealing like mad!
4. solder repair onto abs harness and fit new link cable.
5. Di-noc stearing wheel controls.
6. adjust boot catch to stop squeek,knock
7. adjust bonnet catch
8. finish detailing that i started yesterday. got half way round in 6 hours
Glad i changed all the arb's and droplinks when the coilovers were fitted otherwise they would be on the list too.
Think thats about it
dont sound alot but will keep me going most of the day
if not all of it
really looking forward to having a drive when done as ive had my back shacken to pieces with the cheep nasty fk rubbish. Wish me luck!
Bookmarks